RPP-FIX-60S Express polyurethane adhesive

Professional fast foam adhesive with high adhesion to many materials and substrates

Features and benefits

  • Initial tack after 60 seconds
  • Mechanical anchoring after 2h
  • Complete hardening time after 24h
  • Wide range of applications
  • Excellent adhesion to common construction materials
  • Easy and convenient application

Contact us to get information about product availability and its price

Fill in the form with your details and send request for a RPP-FIX-60S Express polyurethane adhesive

Your request will be sent to our sales department. Please note this is not a purchase order.

    For use also with

    • Polystyrene (EPS) Boards

      Polystyrene (EPS) Boards

    • Plasterboard

      Plasterboard

    • PVC Profile

      PVC Profile

    • Metal Sheet & Profiles

      Metal Sheet & Profiles

    • XPS Extruded Polystyrene Insulation Boards

      XPS Extruded Polystyrene Insulation Boards

    • Oriented Strand Board

      Oriented Strand Board

    • Mineral Wool Boards

      Mineral Wool Boards

    • Timber

      Timber

    • Solid Brick

      Solid Brick

    • Concrete

      Concrete

    • Ceramic Hollow Block

      Ceramic Hollow Block

    • Silicate Blocks

      Silicate Blocks

    Installation guide

    Installation guide
    Installation guide
    Installation guide
    Installation guide
    Installation guide
    1. Wear protective gloves. Ensure surfaces are free from dust, dirt, lime or grease. If the wall surface is dirty it must be primed.
    2. Before using, make sure that the can temperature is above zero (optimum +20°C). Application temperature from +5°C up to +30°C.
    3. Shake can vigorously for 30 seconds to mix properly components.
    4. Screw gun onto the can. Hold can upside-down during application.
    5. Moisten surfaces with water prior to application.
    6. Fill gaps from down to up, zigzag motion, alternating from one wall to the other. Fill gaps to approximately 60 % volume. Max. wide of the gap 3-4 cm. Wider gaps should be applied after hardening of the previous layer. Each layer should be moistened with water using a spray.
    7. After full curing, cut the excess foam with a knife and protect it from UV exposure by coating with plaster, paint, acrylic or silicone.
    8. In the event of a stoppage exceeding five minutes duration, wipe the nozzle with cleaner for foam applicator.
    9. After removing the applicator gun from the can, wipe down the nozzle and gun (internal and external surfaces) using a cleaner.

    Downloads

    Need documents for other product? Visit our Technical Library.

    go to library
    Go to top